Woodend Primary

Edward Beck Drive, Sheidow Park

Contract Type

Design & Construct


Woodend Primary School is part of the Building the Education Revolution projects. The original design was for a standard 4 room GLA building as per the reference designs.

The proposed buildings required redesign to suit the extreme slope of the property and the requirement to remain within the bounds of the existing titles.

A new design linking into the existing building levels utilising a suspended concrete floor slab was implemented providing functional spaces in keeping with the BER standard design storage beneath the facility for grounds keeping and provision of a paved play area.

These include:

Ramps and verandas to transportable buildings

Upgrade of the tech and arts area

Upgrade to the south path and covered learning area

Maintenance and upgrade of staff room and refurbished BBQ area

Woodend Primary

Structure

Integral tit-up and precast concrete with steel framing and brick infill with generous areas of aluminium framed glazing and colorbond wall and roof sheeting.